Analysis Development of the Relationship Between Road Bends and Accidents in the Wonosobo
Muhammad Naufal Ziyad, Bhidara Swantika,Tri Tjahjono
PDF
The Factors Influencing Socio-Political Acceptance of Geothermal Projects in Indonesia
Bianca Salusu, Fadhilah Muslim, Leni Riantini
PDF
Safety Culture Identification For Improving Safety Performance At Pt X
Anes Danubrata, Leni Sagita Riantini, Yusuf Latief
PDF
Environmental impact analysis of solid waste treatment into refused derived fuels(RDF) with life cycle assessmentmethod
Andre Susilo, Djoko M. Hartono, Muhammad Angga Kusuma, Dwica Wulandari
PDF
Identifications Variable to Prevent Lifting Accident Using PDCA Cycle
Yanuwirawan Tri Wahyunugraha, Leni Sagita Riantini, Rossy Armyn Machfudiyanto
PDF
Life Cycle Assessment of Lightweight Beam Concrete Made from Oil Palm Shell Coarse Aggregate
Dasi Agung Ospaman, Nuraziz Handika, Dwica Wulandari
PDF
Assessment of Criteria and Subcriteria in Determining the Selection of Domestic Wastewater Treatment Plant Technology in Situ Manggabolong, South Jakarta
Meta Pradoningrum, Setyo Sarwanto Moersidik, Mochamad Adhiraga Pratama
PDF
Environmental Impact Estimation for Road and Drainage Construction
Agung Nainggolan
PDF
Analysis of The Relationship between Hillines & Bendines Factors to The Number of Accidents in The Wonosobo Area
Fauzi Tirta Kusuma Setiawan1, Bhidara Swantika, Tri Tjahjono
PDF
Evaluation of The Vertical Diffusion of Cs-137 on The Compacted Soil and Bentonite Samples
Nurul E. Ekaningrum, Budi Setiawan, Mochamad A. Pratama
PDF
Traffic Analysis of Merging Segmentation on a Barrier Free Road (Case Study: Jakarta Cikampek Toll Km 48-49A)
Lutfi Medi Haryanto, Andyka Kusuma
PDF
Risk Identification to Improve Time Performance of Callender Hamilton Bridge Replacement andor Duplication Project
Andika Pratama, Ayomi Dita Rarasati
PDF
Risk Analysis on Cost Performance of Contractor Full Pre-Financed (CPF) Toll Road Project: Case Study of ABC Toll Road Project
Farras A. Muhammad, Wisnu Isvara, Mohammad Ichsan, Jodi N. Handibiyanto
PDF
Numerical Modeling of API 650 Storage Tank Foundation Stability in Limestone Layers with Cavities without Grouting
Yanuar Budiman, Widjojo A. Prakoso
PDF
Stakeholder Engagement Strategy: A Methods of Measurement and Classification of Project Stakeholders
Mokhamad Fakhrur Rifqie
PDF
Evaluation of Design of The Climbing Lane on The Semarang-Solo Toll Road
Citra Ayu Civilia, Andyka Kusuma
PDF
Development of Risk-Based Audit Method Standard For Stadium Project using Design and Build Contract to Minimize Dispute
Nova Sundralawanti, Anggoro Putro, Yusuf Latief
PDF
Evaluation of the Quality of the First Mile and Last Mile System for Public Transport (Study Case: MRT Jakarta)
Nur Qurota Uyuny Syarief, Nahry
PDF
Development Road Safety Analysis Based on Geometric features on Toll Road Infrastructure
Deny Yuda Hermawan, Tri Tjahjono, Bhidara Swantika
PDF
Analysis of Risk and Claim inthe Construction of Refinery Project to Reduce Dispute
Vinia Puspita Arryani, Ayomi Dita Rarasati
PDF
Study of Dynamic Behavior of Multi-Story Non-Engineered URM Building Strengthened with Ferrocement Layers
Arthur Reginald Tani, Josia Irwan Rastandi
PDF
Tin Slag 2 Waste Utilization as Fine Aggregate Substituent on Mortar: Characteristics and Compressive Strength
Hermawan Puji Yuwana, MochamadAdhiraga Pratama, Nuraziz Handika, Sugeng Purnomo
PDF
Productivity Improvement Strategy For High Rise Building Construction Project Based on Collaboration (Case Study : Upper Structure Work on Project XYZ)
Prayudha Widwicahyo, Leni Sagita Riantini, Afrizal Nursin
PDF
Qualitative Risk Analysis on Time Performance of A Full Pre-Financed Contractor Scheme (CPF) in Toll Road Projects
Jodi N. Handibyanto, Wisnu Isvara, Mohammad Ichsan, Farras A.Muhammad
PDF
Life Cycle Assessment of Hot Mix Asphalt Pavement Rehabilitation in West Java, Indonesia
Dwi Ajeng Sarasputri, Djoko M Hartono, Dwica Wulandari, Fikri Dinegoro
PDF